Project: Bozeman High School
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| General Contractor: | Dick Anderson Construction |
| Architect: | Comma-Q Architecture |
| Engineer: | Bronec and Associates |
| Project Manager: | Greg Corn |
| Plumbing: | Marcus Wilcox |
| Sheetmetal: | Dave Chapman |
| Description: | The project involves a remodel of the original building(s) with an addition that will house a new kitchen, cafeteria and library. The project, which started in the Fall of ’08 and is to be completed in 2010, also includes 3 Boiler/Mechanical Rooms, 9 Air Handlers and a 70’ x 40’ room that is to be acoustically insulated and converted into an Air Handler, complete with separate hot and cold decks. |